Plumbing, hotwater heater and tile day!

Tile guy!
04/10/00
Look at the rails!
04/10/00
And the toilet,
04/10/00
sink
04/10/00
and shower fixtures!
04/10/00
The losers - last ones in are rotten eggs.
04/10/00
Vinyl flooring
04/10/00
and the hotwater heater!
04/10/00
Our stair rail!
04/10/00
and the tile surround in the Master Bathroom
04/10/00
More vinyl.
04/10/00
and our high capacity attic stairs. Charlie will b moving in soon. We'll have a lock installed shortly after.
04/10/00
Staking his claim already.
04/10/00
Racing toilets - sleek lines!
04/10/00
Not soon enough!
04/10/00