Lots going on today. Virginia Power has buried, connected and energised our 400 amp service. And Shane the insulation guy will finish up later today. The sheetrock is on the way and will begin on Monday we hope!

The meter base
02/11/2000
The trencher
02/11/2000
The ditch
02/11/2000
The operator
02/11/2000
The back stoop with its new columns
02/11/2000
The front of the house in the middle of the set
02/11/2000
The front stoop
02/11/2000
The insulation
02/11/2000
More insulation
02/11/2000
The operator again
02/11/2000
The lady of the house
02/11/2000
The upstairs HVAC return
02/11/2000
And then there's Shane the insulation guy
02/11/2000
Ceiling insulation
02/11/2000
Virginia Power guy makeing the final connections
02/11/2000
Collective work...
02/11/2000